- Location
Tripoli - Libya
- Duration
14.06.2009 - 11.02.2010 (8 months)
- Status
Completed
- Construction Area
60.000,00 sqm
St.Julians – Malta
July 2019 - December 2020 - 18 Months
Ongoing
50.000 m²
Julians – Malta
19.06.2020 - 31.12.2020
Completed
15.550 sqm
Julians – Malta
18 month
Completed
13.139 m2
Valletta, Malta
03.06.2020 - 30 Month
Ongoing
Shore Connection, Construction and Restoration Works
Corradino, Paola, Malta
110 Hafta (2023-2025)
Ongoing
28.300 m2
Thomas Bay Malta
02.06.2020 - 14 Month
Completed
-